Product Description
- Provides a clear visual QA checklist for fittings and flange assembly, ensuring no procedural steps are overlooked.
- Designed with three distinct colour-coded tear-off sections:
- Inspected (Blue): Confirms fitting has been checked and approved.
- Fitting Tightened (Yellow): Records tightening stage, installation marking, and gap verification.
- Fitting Assembled (Red): Confirms final assembly with checks for ferrules, swage inspection, and tube protrusion.
- 3-stage flange tags – fitting management is manufactured using durable 0.5mm PVC sheets.
- Also Available in durable PVC (0.3mm, 0.7mm) or Non-Tearable Paper, ensuring long-lasting use (MOQ Applicable).
- Resistant to weather, tear, water, oil, dirt, and chemicals, making it suitable for oil & gas plants, offshore rigs, petrochemical facilities, and refineries.
- Writable surface allows operators to record tightening details, inspector names, dates, and specific QA notes.
- Perforated tear-off sections create a sequential, traceable record for retention and audits.
- Helps to standardise fitting QA workflows, ensuring consistency across teams and shifts.
- Ideal for commissioning, shutdowns, turnarounds, and maintenance projects, where multiple fittings are worked on simultaneously.
- Equipped with an 8mm pre-punched hole for secure attachment using cable ties.





















